top of page

UniPhi 20 to UniPhi 22 - New Features

  • Jul 29, 2025
  • 5 min read

Updated: Jul 13

Abilities


  • Added French translation

  • Added ability to define multiple working day Calendars to handle holidays in multiple jurisdictions, each project may have one Calendar

  • Added ability to create and update projects via the API (also listed under API)

  • NEW Added Spanish, Portuguese and Mesopotamian Arabic translations


Accounting Integration


  • NEW There is now an out of the box Excel copy/paste accounting integration, with support for apportioning transactions to a project ledger (UniPhi Chart of Accounts) if the source system does not support such a concept


AI


  • NEW Added the ability to generate an AI Summary of a Document

  • NEW Added the ability to generate an AI Summary of an Issue


API


  • Added /api/personorganisation endpoint

  • Added EffortModifiedByID, EffortModifiedByName and EffortModifiedDate fields to /api/contracteffort

  • Added PUT, POST and DELETE methods for /api/milestone and /api/milestonehistory

  • Added PUT, POST and DELETE options for /api/lifecyclephase, /api/location, /api/projecttype, /api/region, /api/sector and /api/serviceline

  • Implemented api/timesheettask and api/timesheettasklist endpoints

  • NEW Added /api/asset and /api/assetproject endpoints

  • NEW Added /api/contracturalbillabletimesnapshot, which will be taken when generating a month end snapshot or portfolio wide snapshot which includes resource planning

  • NEW Added /api/ContrectEffortSnapshotHeader endpoint

  • NEW Added /api/externalschedule endpoint, which returns Tasks and Milestones uploaded from P6 and Microsoft Project


Authentication


  • Connecting to the UniPhi API from Excel or PowerBI is possible via "Organizational Account" (Entra ID / Microsoft 365 account)

  • SSO using an Entra ID / Microsoft 365 account is enabled by default and supports logins from any Entra tenant


Contracts


  • Added a new Contract Adjustment Derivative method based on % of Amount Complete

  • Added ability to link Contract Deliverables with Issues

  • Added ability to perform Excel copy/paste import to create Contracts

  • Added ability to perform Excel copy/paste import to create or update Contract Deliverables and Variations across all projects at once

  • Imported expenses may now be mapped to a Contract Deliverable or Variation as Disbursement items

  • Timesheet Preview in Revenue Contracts filtered by context when drilled into Deliverable or Variation

  • Progress Claim template control can batch process all claims for all suppliers on a project in the month

  • NEW Added a "Show Hierarchy" switch to the Contract -> Effort module, which will always show the contract structure, even after drilling into a summary level or separable portion

  • NEW Added the ability to capture Budget Cashflow at the Contract level

  • NEW Added Cashflow and Resource Planning charts to the Contract -> Schedule module

  • NEW Added the ability to tag changes in the Last Claim interface with a Status of Reclaim, Fix Original or In Dispute. In Dispute items will have their Certified Values carried forward to the next claim, significantly improving the workflow when records may remain in dispute for some months

  • NEW Budget Contract Cashflow may now be imported from the Excel copy/paste routine

  • NEW Improved support for tracking Timesheets against Lump Sum and Upper Limit Fee Deliverables and Variations by divorcing Contract Value from Contract Invoice Value


Costs / Resources / Revenue


  • Added transactional method for Budget Changes (Budget Transfers) (optional feature)

  • Added per-lifecycle filtering to Project Costs template control

  • NEW The Phasing module now has a "Show Blanks" switch, so you may hide account codes without a Budget or Forecast which needs to be timephased

  • NEW You may now build your own Views in the Costs and Revenue modules


Documents


  • Added "Display Signatures" template control

  • Added a "plain" table style without borders or header formatting

  • Added a new "Transmittal" Layout to the File Upload (Multi) template control

  • Added a Register interface showing who has had files transmitted, viewed or downloaded

  • Added template variable $Document.Claim.TotalIncTaxInWords compatible with progress claims

  • Added ability to create Views in the Documents module

  • Added contextual new document links to Issues, Risks, Budget and Time modules

  • Progress Claim template: Added Customer Deduction Due Date field

  • Improved email clarity when sending documents as Link, PDF or Embedded Text

  • NEW Added Contract Resource Plan template control

  • NEW Enhanced and harmonised the Budget, Net Budget, Project Costs and Project Costs Net template controls, giving greater control over the format and data output by each

  • NEW The background image of the Coversheet stylesheet can now be set per project by uploading an image to a Project Custom Field named "Cover Image"

  • NEW The Extension of Time (EOT) template control output is now highly configurable


Email Notifications


  • Profile option to include Overdue and Upcoming Tasks in notifications


Expenses


  • Added Expense Category and Notes fields

  • Added column picking and re-ordering to the Expenses import and management interface

  • Added Cost Margin and Charge Margin columns to expenses import

  • Added Task Name, Line No, Comment as importable fields; Approval Ref editable

  • Added ability to split imported expense transactions

  • Added Transaction Type, Event Date and ability to map Expense to a Person

  • Added bulk update for editable expense fields

  • Timesheet Administrators can import and manage expenses for their Organisation


Invoices


  • Added ability to add prefix to invoice numbers under Configuration -> Contracts -> Settings


Issues


  • Added ability to create new Views in Issues module

  • Added ability to have Workflows filtered by Category and List Custom Fields of Issues

  • Added an Actions sub-navigation tab

  • Added ability to export Issues and Attachments under Configuration -> Export

  • NEW Added a Days Open field which counts the number of days the issue has been open for


Microsoft Project Integration


  • NEW The Critical flag on Tasks and Milestones is now captured on import and can be used as a filter when mapping the Project WBS to the UniPhi WBS


P6 Integration


  • NEW Tasks and Milestones where the EarlyStartDate = LateStartDate are now marked as Critical and have a filter option in the Time -> External Schedule module


Phasing


  • NEW Overhauled the interfaces for Timephasing Resource Planning, Costs and Revenue, both at the Project level and the Contract level


Rates


  • NEW It is now possible to create Rate Custom Fields. These can be populated in a resource's rate history and can be incorporated into Timesheet Penalty Rate calculations


Reckon Integration


  • Transitioned to "Reckon Web Connector" from legacy "Quickbooks Web Connector"


Reports


  • Added Milestone Export report

  • Added Issue Workflows report

  • Added Contract Resource Plan Export report

  • Added Resource Rate History Export report

  • NEW Added a range of Cashflow reports to the Project Manager report tab

  • NEW Added Budget Transfers report

  • NEW Added Claim Reconciliation report, which provides per-claim transactions from Program Time and Material Invoices, plus any Unclaimed Transactions and Adjustments

  • NEW Added Progress Claim by Code report

  • NEW Added Project Costs Report and Project Costs Report Detail reports to the Project Manager report folder

  • NEW Added Project Timesheet Tasks report, which lists which timesheet tasks are available on each project

  • NEW Added Weekly Resource Allocation by Contract report


Resource Planning


  • Resource planning screen viewable by Cost/Charge as well as Hours and %

  • NEW Overhauled the Resource Planning interfaces, implementing more options for quickly establishing and managing the resource plan


Templates


  • NEW Issue Detail: Added additional column options including Date Logged, Logged By, Closed By and Modified Date


Timesheets


  • NEW Timesheet Administrators may now use the copy/paste timesheet import


Xero

  • NEW It is now possible to connect to multiple Xero Organisations from the one UniPhi deployment




 
 
 

Related Posts

See All
Project-branded document coversheets

Document coversheets can now be branded per project. Upload an image to a Project Custom Field named “Cover Image” and the Coversheet stylesheet will use it as the background for that project’s docume

 
 
 

Comments


Subscribe to our UniPhi newsletter

Thanks for submitting!

  • Twitter
  • Youtube
  • Linkedin

© 2024 by UniPhi

bottom of page