To Add Risk Levels:
1. Go to Configuration > Risks and scroll to the Risk Levels box
2. Click on the Add button. The below fields will be displayed:
3. Enter in the Risk Level and Rank, and select an icon colour to represent the level you are creating.
Risk levels and icons in UniPhi: UniPhi allows for creation of 5 risk levels, graphically represented by 5 Icons. These icons are based on typical RAG (red, amber, green) traffic light indicators, but to allow users to define risk levels in greater detail, red, orange, yellow, blue and green icons can be selected.
See the two examples below, which illustrate risk level options in UniPhi:
Organisations must determine their own risk levels within the risk matrix functionality.
4. Save your entry.
5. Repeat the process to complete adding all risk levels
You now know how to add risk levels in UniPhi
Comments